Data Pencairan:
SD: 2025-02-28
SMP: 2025-02-28
SMA: 2025-02-28
SMK: 2025-02-28
|
|
Disalurkan |
Pemberian |
Pemberian Dari Aktivasi Nominasi |
Pemberian Relaksasi |
PKBM SYAFAAT CIPTA CENDEKIA (P9984332) |
|
Siswa |
4 |
0 |
0 |
4 |
|
Dana |
900.000 |
0 |
0 |
900.000 |
|
SD NEGERI 1 BUKE (40401842) |
|
Siswa |
149 |
73 |
12 |
64 |
|
Dana |
61.425.000 |
29.925.000 |
5.400.000 |
26.100.000 |
|
SD NEGERI 10 BUKE (40402102) |
|
Siswa |
53 |
20 |
23 |
10 |
|
Dana |
20.250.000 |
7.875.000 |
10.125.000 |
2.250.000 |
|
SD NEGERI 11 BUKE (40402061) |
|
Siswa |
79 |
43 |
0 |
36 |
|
Dana |
31.050.000 |
15.975.000 |
0 |
15.075.000 |
|
SD NEGERI 12 BUKE (40401824) |
|
Siswa |
96 |
50 |
22 |
24 |
|
Dana |
38.475.000 |
18.675.000 |
9.900.000 |
9.900.000 |
|
SD NEGERI 13 BUKE (40401843) |
|
Siswa |
43 |
15 |
8 |
20 |
|
Dana |
17.325.000 |
6.075.000 |
3.600.000 |
7.650.000 |
|
SD NEGERI 14 BUKE (40402090) |
|
Siswa |
65 |
27 |
32 |
6 |
|
Dana |
26.775.000 |
11.025.000 |
14.175.000 |
1.575.000 |
|
SD NEGERI 15 BUKE (40405063) |
|
Siswa |
11 |
7 |
0 |
4 |
|
Dana |
4.275.000 |
2.700.000 |
0 |
1.575.000 |
|
SD NEGERI 16 BUKE (40405150) |
|
Siswa |
21 |
9 |
9 |
3 |
|
Dana |
6.975.000 |
2.700.000 |
2.925.000 |
1.350.000 |
|
SD NEGERI 2 BUKE (40401926) |
|
Siswa |
95 |
88 |
0 |
7 |
|
Dana |
37.575.000 |
34.875.000 |
0 |
2.700.000 |
|
SD NEGERI 3 BUKE (40402086) |
|
Siswa |
59 |
36 |
5 |
18 |
|
Dana |
23.625.000 |
15.075.000 |
2.250.000 |
6.300.000 |
|
SD NEGERI 4 BUKE (40402070) |
|
Siswa |
83 |
58 |
12 |
13 |
|
Dana |
31.275.000 |
23.175.000 |
5.175.000 |
2.925.000 |
|
SD NEGERI 5 BUKE (40401957) |
|
Siswa |
62 |
44 |
0 |
18 |
|
Dana |
24.300.000 |
17.775.000 |
0 |
6.525.000 |
|
SD NEGERI 6 BUKE (40402097) |
|
Siswa |
42 |
34 |
0 |
8 |
|
Dana |
16.650.000 |
13.725.000 |
0 |
2.925.000 |
|
SD NEGERI 7 BUKE (40401958) |
|
Siswa |
19 |
9 |
2 |
8 |
|
Dana |
7.200.000 |
3.150.000 |
900.000 |
3.150.000 |
|
SD NEGERI 8 BUKE (40401936) |
|
Siswa |
62 |
19 |
1 |
42 |
|
Dana |
25.650.000 |
6.975.000 |
450.000 |
18.225.000 |
|
SD NEGERI 9 BUKE (40405105) |
|
Siswa |
38 |
22 |
0 |
16 |
|
Dana |
15.975.000 |
9.000.000 |
0 |
6.975.000 |
|
Total |
Siswa |
0 |
0 |
0,00% |
Total |
Rp |
0 |
0 |
0,00% |