Data Pencairan:
SD: 2025-02-28
SMP: 2025-02-28
SMA: 2025-02-28
SMK: 2025-02-28
|
|
Disalurkan |
Pemberian |
Pemberian Dari Aktivasi Nominasi |
Pemberian Relaksasi |
SD NEGERI 1 BATU ITAM (10102838) |
|
Siswa |
33 |
23 |
0 |
10 |
|
Dana |
13.275.000 |
9.000.000 |
0 |
4.275.000 |
|
SD NEGERI 1 TAPAKTUAN (10102848) |
|
Siswa |
7 |
6 |
0 |
1 |
|
Dana |
3.150.000 |
2.700.000 |
0 |
450.000 |
|
SD NEGERI 10 TAPAKTUAN (10102690) |
|
Siswa |
37 |
0 |
0 |
37 |
|
Dana |
16.650.000 |
0 |
0 |
16.650.000 |
|
SD NEGERI 2 BATU ITAM (10102653) |
|
Siswa |
29 |
20 |
0 |
9 |
|
Dana |
11.700.000 |
8.100.000 |
0 |
3.600.000 |
|
SD NEGERI 3 TAPAKTUAN (10102994) |
|
Siswa |
25 |
18 |
0 |
7 |
|
Dana |
9.900.000 |
6.750.000 |
0 |
3.150.000 |
|
SD NEGERI 4 TAPAKTUAN (10102975) |
|
Siswa |
32 |
26 |
0 |
6 |
|
Dana |
13.050.000 |
10.350.000 |
0 |
2.700.000 |
|
SD NEGERI 5 UNGGUL TAPAKTUAN (10102976) |
|
Siswa |
39 |
26 |
0 |
13 |
|
Dana |
15.750.000 |
9.900.000 |
0 |
5.850.000 |
|
SD NEGERI 6 TAPAKTUAN (10102978) |
|
Siswa |
27 |
22 |
0 |
5 |
|
Dana |
11.475.000 |
9.225.000 |
0 |
2.250.000 |
|
SD NEGERI 7 TAPAKTUAN (10102979) |
|
Siswa |
20 |
17 |
0 |
3 |
|
Dana |
8.100.000 |
6.975.000 |
0 |
1.125.000 |
|
SD NEGERI 8 TAPAKTUAN (10102669) |
|
Siswa |
24 |
18 |
0 |
6 |
|
Dana |
9.675.000 |
6.975.000 |
0 |
2.700.000 |
|
SD NEGERI 9 TAPAKTUAN (10102670) |
|
Siswa |
33 |
19 |
0 |
14 |
|
Dana |
14.400.000 |
8.100.000 |
0 |
6.300.000 |
|
SD NEGERI AIR BERUDANG (10102980) |
|
Siswa |
33 |
32 |
0 |
1 |
|
Dana |
13.725.000 |
13.275.000 |
0 |
450.000 |
|
SD NEGERI JORONG HULU (10102946) |
|
Siswa |
43 |
34 |
0 |
9 |
|
Dana |
17.550.000 |
13.500.000 |
0 |
4.050.000 |
|
SD NEGERI LHOK KEUTAPANG (10102665) |
|
Siswa |
35 |
32 |
0 |
3 |
|
Dana |
13.725.000 |
12.375.000 |
0 |
1.350.000 |
|
SD NEGERI LHOK RUKAM (10102667) |
|
Siswa |
23 |
23 |
0 |
0 |
|
Dana |
9.225.000 |
9.225.000 |
0 |
0 |
|
SD NEGERI PANJUPIAN (10102679) |
|
Siswa |
55 |
45 |
0 |
10 |
|
Dana |
23.400.000 |
18.900.000 |
0 |
4.500.000 |
|
SD NEGERI PANTON LUAS TAPAKTUAN (10102607) |
|
Siswa |
20 |
9 |
0 |
11 |
|
Dana |
8.100.000 |
3.150.000 |
0 |
4.950.000 |
|
Total |
Siswa |
0 |
0 |
0,00% |
Total |
Rp |
0 |
0 |
0,00% |