Data Pencairan:
SD: 2025-12-26
SMP: 2025-12-26
SMA: 2025-12-23
SMK: 2025-12-23
| |
|
Disalurkan |
Pemberian |
Pemberian Dari Aktivasi Nominasi |
Pemberian Relaksasi |
| SD NEGERI 1 PATALAGAN (20212771) |
| |
Siswa |
93 |
45 |
35 |
13 |
| |
Dana |
37.800.000 |
18.675.000 |
15.750.000 |
3.375.000 |
| |
| SD NEGERI 1 TENJOLAYAR (20213098) |
| |
Siswa |
79 |
69 |
10 |
0 |
| |
Dana |
33.525.000 |
29.025.000 |
4.500.000 |
0 |
| |
| SD NEGERI 2 PATALAGAN (20212784) |
| |
Siswa |
72 |
52 |
15 |
5 |
| |
Dana |
29.700.000 |
21.375.000 |
6.750.000 |
1.575.000 |
| |
| SD NEGERI 2 TENJOLAYAR (20213097) |
| |
Siswa |
70 |
30 |
30 |
10 |
| |
Dana |
29.250.000 |
12.600.000 |
13.500.000 |
3.150.000 |
| |
| SD NEGERI DANALAMPAH (20213407) |
| |
Siswa |
80 |
50 |
17 |
13 |
| |
Dana |
31.725.000 |
19.800.000 |
7.650.000 |
4.275.000 |
| |
| SD NEGERI KAHIYANGAN (20213484) |
| |
Siswa |
54 |
48 |
3 |
3 |
| |
Dana |
22.050.000 |
19.800.000 |
1.350.000 |
900.000 |
| |
| SD NEGERI MEKARJAYA (20212705) |
| |
Siswa |
90 |
63 |
22 |
5 |
| |
Dana |
37.575.000 |
25.875.000 |
9.900.000 |
1.800.000 |
| |
| SD NEGERI PANCALANG (20212726) |
| |
Siswa |
120 |
90 |
14 |
16 |
| |
Dana |
47.925.000 |
37.800.000 |
6.300.000 |
3.825.000 |
| |
| SD NEGERI RAJAWETAN (20212731) |
| |
Siswa |
79 |
53 |
15 |
11 |
| |
Dana |
33.525.000 |
23.850.000 |
6.750.000 |
2.925.000 |
| |
| SD NEGERI SAREWU (20213064) |
| |
Siswa |
84 |
56 |
23 |
5 |
| |
Dana |
33.975.000 |
21.825.000 |
10.350.000 |
1.800.000 |
| |
| SD NEGERI SILEBU (20213076) |
| |
Siswa |
103 |
78 |
16 |
9 |
| |
Dana |
40.725.000 |
30.375.000 |
7.200.000 |
3.150.000 |
| |
| SD NEGERI SINDANGKEMPENG (20213035) |
| |
Siswa |
55 |
42 |
3 |
10 |
| |
Dana |
22.725.000 |
18.450.000 |
1.350.000 |
2.925.000 |
| |
| SD NEGERI SUMBAKELING (20213131) |
| |
Siswa |
61 |
48 |
1 |
12 |
| |
Dana |
26.550.000 |
21.375.000 |
450.000 |
4.725.000 |
| |
| SD NEGERI TAJURBUNTU (20213141) |
| |
Siswa |
78 |
61 |
8 |
9 |
| |
Dana |
31.050.000 |
24.750.000 |
3.600.000 |
2.700.000 |
| |
| SD NEGERI TARIKOLOT (20258118) |
| |
Siswa |
76 |
60 |
6 |
10 |
| |
Dana |
31.500.000 |
24.300.000 |
2.700.000 |
4.500.000 |
| |
| Total |
Siswa |
0 |
0 |
0,00% |
| Total |
Rp |
0 |
0 |
0,00% |