Kecamatan Kec. Bilah Hilir
Data Pencairan:
SD: 2025-02-28
SMP: 2025-02-28
SMA: 2025-03-07
SMK: 2025-03-07
| |
|
Sk |
Aktivasi |
% |
| SD SWASTA BINA DHARMA PT. HSJ (60726066) |
| |
Siswa |
15 |
9 |
60,00% |
| |
Dana |
6.750.000 |
4.050.000 |
60,00% |
| |
| SDN 01 BILAH HILIR (10205900) |
| |
Siswa |
36 |
32 |
88,89% |
| |
Dana |
10.800.000 |
9.450.000 |
87,50% |
| |
| SDN 02 BILAH HILIR (10205899) |
| |
Siswa |
20 |
5 |
25,00% |
| |
Dana |
7.425.000 |
2.250.000 |
30,30% |
| |
| SDN 03 BILAH HILIR (10205898) |
| |
Siswa |
49 |
47 |
95,92% |
| |
Dana |
18.450.000 |
18.000.000 |
97,56% |
| |
| SDN 04 BILAH HILIR (10205897) |
| |
Siswa |
57 |
55 |
96,49% |
| |
Dana |
16.425.000 |
15.975.000 |
97,26% |
| |
| SDN 05 BILAH HILIR (10205896) |
| |
Siswa |
6 |
6 |
100,00% |
| |
Dana |
2.250.000 |
2.250.000 |
100,00% |
| |
| SDN 06 BILAH HILIR (10205876) |
| |
Siswa |
16 |
16 |
100,00% |
| |
Dana |
5.625.000 |
5.625.000 |
100,00% |
| |
| SDN 07 BILAH HILIR (10205860) |
| |
Siswa |
29 |
26 |
89,66% |
| |
Dana |
13.050.000 |
11.700.000 |
89,66% |
| |
| SDN 08 BILAH HILIR (10205859) |
| |
Siswa |
4 |
4 |
100,00% |
| |
Dana |
1.575.000 |
1.575.000 |
100,00% |
| |
| SDN 09 BILAH HILIR (10205841) |
| |
Siswa |
3 |
3 |
100,00% |
| |
Dana |
1.350.000 |
1.350.000 |
100,00% |
| |
| SDN 10 BILAH HILIR (10205018) |
| |
Siswa |
21 |
18 |
85,71% |
| |
Dana |
9.000.000 |
7.650.000 |
85,00% |
| |
| SDN 12 BILAH HILIR (10205025) |
| |
Siswa |
26 |
26 |
100,00% |
| |
Dana |
11.700.000 |
11.700.000 |
100,00% |
| |
| SDN 13 BILAH HILIR (10205130) |
| |
Siswa |
1 |
0 |
0,00% |
| |
Dana |
450.000 |
0 |
0,00% |
| |
| SDN 14 BILAH HILIR (10205091) |
| |
Siswa |
10 |
9 |
90,00% |
| |
Dana |
4.500.000 |
4.050.000 |
90,00% |
| |
| SDN 15 BILAH HILIR (10205090) |
| |
Siswa |
5 |
5 |
100,00% |
| |
Dana |
2.250.000 |
2.250.000 |
100,00% |
| |
| SDN 16 BILAH HILIR (10204912) |
| |
Siswa |
10 |
8 |
80,00% |
| |
Dana |
4.275.000 |
3.375.000 |
78,95% |
| |
| SDN 17 BILAH HILIR (10204910) |
| |
Siswa |
12 |
12 |
100,00% |
| |
Dana |
5.400.000 |
5.400.000 |
100,00% |
| |
| SDN 19 BILAH HILIR (10204907) |
| |
Siswa |
24 |
24 |
100,00% |
| |
Dana |
10.800.000 |
10.800.000 |
100,00% |
| |
| SDN 20 BILAH HILIR (10204894) |
| |
Siswa |
18 |
17 |
94,44% |
| |
Dana |
8.100.000 |
7.650.000 |
94,44% |
| |
| SDN 21 BILAH HILIR (10204893) |
| |
Siswa |
37 |
35 |
94,59% |
| |
Dana |
16.650.000 |
15.750.000 |
94,59% |
| |
| SDN 22 BILAH HILIR (10204968) |
| |
Siswa |
1 |
0 |
0,00% |
| |
Dana |
450.000 |
0 |
0,00% |
| |
| SDN 23 BILAH HILIR (10205293) |
| |
Siswa |
6 |
6 |
100,00% |
| |
Dana |
2.700.000 |
2.700.000 |
100,00% |
| |
| SDN 24 BILAH HILIR (10205292) |
| |
Siswa |
7 |
7 |
100,00% |
| |
Dana |
3.150.000 |
3.150.000 |
100,00% |
| |
| SDN 25 BILAH HILIR (10205428) |
| |
Siswa |
4 |
0 |
0,00% |
| |
Dana |
1.800.000 |
0 |
0,00% |
| |
| SDN 26 BILAH HILIR (10205422) |
| |
Siswa |
1 |
0 |
0,00% |
| |
Dana |
450.000 |
0 |
0,00% |
| |
| SDN 27 BILAH HILIR (10260883) |
| |
Siswa |
13 |
0 |
0,00% |
| |
Dana |
5.850.000 |
0 |
0,00% |
| |
| SDN 29 BILAH HILIR (69787423) |
| |
Siswa |
10 |
9 |
90,00% |
| |
Dana |
4.500.000 |
4.050.000 |
90,00% |
| |
| Total |
Siswa |
441 |
379 |
85,94% |
| Total |
Rp |
175.725.000 |
150.750.000 |
85,79% |